Friday, April 13, 2012

Link A Finish Friday #11

The Goal for me this year is 52 Finishes in 52 weeks help keep me honest and show off your own finishes at the same time its a Link A Finish Friday!!


The most popular link by a large margin last week was El Petit Taller - Wonky Squares Thank you to all that linked up last week.

This week I actually got some finishes unlike the last 2 weeks.  The family is getting adjusted to having a new baby in the home and its back to business.  In fact I made my first Quilt to sell this last week. 


 I even created a Etsy Store to sell my quilts.  If you are interested check it out. 

So for the rules.

1) Who likes rules. Toss them out.
2) Add a link to your finish blog or where ever you show off your finishes (Not limited to quilts but I like them the most).
3) Visit a few of the finishes and comment or encourage them on.

Not Required but fun to do

1) Follow my blog.
2) Follow the blog of all those that link.
3) Link back to my blog.
4) No finish, go quilt and stop reading the web.

Thursday, April 12, 2012

Look what I found when I got home


For those that do not know what this is this is one of the Traveling Stash  This one came to me by 
From Blank Pages   My kids are bugging me to open the box so will go do that but wanted you to know that it has arrived and in a few days will talk more about it.  If you do not know what the Traveling Stash is visit http://vroomansquilts.blogspot.com/ She is great at keeping track of the stash and talks about it often.

Wednesday, April 11, 2012

WIP Wednesday #9


Today is going to be a Work In Progress Wednesday.   And will be linking up with Freshly Pieced. 

WIP Wednesday at Freshly Pieced

Completed Projects:

4 completes this week and we even kept the baby though she is screaming at me while making this post.


Ready To Quilt:
5 Quilt tops ready to quilt here are 3 of them


Ongoing Projects:
1 Quilt 5 X 5 blocks.  Also Jeans for Jared, 3 new baby quilts 1 more John Deer Quilt and I now started sewing the Case Machinery Lap quilt. Oh and Rebecca's sampler and Tanya's Hearts that are recently floating to the top of the pile.

Planned Quilts:
2 Bug Jar Quilts for nephews.
Tanya's Lap quilts from her fat quarters.
Rose Fabric for Mother In Law's Quilt.

Totals:
Finished: 4 April, 10 March, 10 February, 7 January
31 Total for Year
Ready to Quilt: 5
On Going Projects: 8
Planned: 4 (though I keep thinking I am missing a couple)

One more plea for my Quilting Challenge I want to do a monthly or so quilting challenge I am inspired by things (art, chairs, carpet, wallpaper, etc) and I want to create quilts inspired from it.  This first challenge is based on a pair of chairs at work in my office.  Some at work called them hideous, me they are inspiration.  Post about it  http://richardquilts.blogspot.com/2012/04/richard-quilts-quilting-challenge-1.html I set up a flicker page to track your contributions http://www.flickr.com/groups/richardquiltschallenge/ The plan is to make a quilt top from blocks contributed by any one that wants to give this a try and then raffle it off to those that enter.


Tuesday, April 10, 2012

Tractors on Patrol


This is my newest finish this one is for my father in law he lives in a small town in Southern Utah and just does not understand me the City kid programmer.  My wife thought it would be fun to give him what he loves best his John Deer it should keep him warm while out on the backhoe or grader he uses for a living.



Could not resist getting a shot of Julia on it in the sun.


This quilt has 3 materials on top 2 of which are cotton and one is a flannel (the lighter brown one)  The back has all of the same a green flannel.


This one ragged up wonderfully.  I will be making a similar one for my brother in law but with one more front and one more back as the original amount of material was not enough with the slightly longer lap quilts we made for them (they are both tall)


April Finishes

linking to 2nd Quarter Finish Party As listed on  My 2nd Quarter todo list

Monday, April 9, 2012

Quarter 2 2012 Finish-A-Long

Reading Posts today I found this and decided I have a pile of things on the list that needs finishing and a excuse to do them. So first off linking to 2012 Finish Along with this button.


1) Rebecca's Sampler Started January still not finished.

2) Jeans for Jared Started January, Worked on in March still unfinished

3) Blue Hearts started January still not finished

4) Diamond Quilt Top

5) First of 2 Granny Squares top

6) Kathy's Quilt Top

7) 2nd Granny Square Top

8) Orange Quilt Top

9) John Deer Quilt


10) Case Quilt
Material Bought and Some square sewn but nothing more

11) 2 Blue, 2 Purple Baby Quilts.
the purple material left is for girl baby quilt (one done 1 to go) right is for 2 boy baby quilts.  3 reds in middle is for the Case quilt, and the John Deer quilt is the green material in the back.

Wow too many projects that I am working on (and sadly their are about 4 others just no pictures and too tired to think what they are but I never realized I had so many projects going but now I am committed I have to finish them the quarter.)













Related Posts Plugin for WordPress, Blogger...